Every belief shift hardened in the same direction: POWI is leaning harder into data center power infrastructure across GaN, SiC, and solid-state transformer sockets, with NVIDIA collaboration deepening around 800-volt DC architectures.
Tessara post-call read · synthesized from the earnings-call transcriptreported May 9, 2026
Tessara Pro
See the full POWI read
What moved, what it means for the thesis, and the signal others missed. Every name you cover, the night it prints.