Every capacity constraint hardened simultaneously. Demand exceeds supply by 4x per GPU, power contracts jumped to 3.5 GW ahead of schedule, and CapEx guidance rose 25% at the midpoint to fund the buildout.
Tessara post-call read · synthesized from the earnings-call transcriptreported May 13, 2026
Tessara Pro
See the full Nebius read
What moved, what it means for the thesis, and the signal others missed. Every name you cover, the night it prints.